ProRail declaration for damage to the railway bridge: repair a major job

It is not yet clear how long it will take before the bridge and the railway are restored. “We are now investigating whether we might be able to repair the first damage with a temporary repair, or whether we will carry out a permanent repair. The latter will be quite a job, not only for train traffic but also for road traffic,” explains Baas. .

ttn-44