Geen places for new loads in the Netherlands by overflowing electricity | Buitenland

Over the last three years, the available net capacity in dried up buildings has been exceeded, says Rutger Croon from ElaadNL. Because of this, he has been asked to give a message to the public, tending autos in a slim manner.

In the case of ‘slim loading’, the word is that the electrical system is digitally connected to the electrical network. That’s why the car can’t be loaded when it’s used up a little bit of electricity, at night. The Dutch state secretaris van infrastructure and Waterstraat Vivianne Heijnen wrote long ago in a letter to the camera that deze techniek al vanaf 2025 was de norm moet.

ttn-39