Flanders has a coastal vision ready for the longer term

For the port of Ostend, there is still a choice between all-round embankment, a storm surge barrier for the harbor mouth or a lock complex. A lock or storm surge barrier must also be built for the Blankenberge marina.

They are already building a storm surge barrier in Nieuwpoort, but in the long term a higher storm surge barrier will have to be built at the same location.

ttn-40