Contractor Vaessen completed the construction of the new swimming pool in December The Watergeus. After our last visit in September, a lot has changed: the competition pool and target group pool are filled with water, the changing rooms are ready and the recreational pools are tiled.
After completion, the swimming pool is not yet ready for use. The sunbathing areas, catering and various areas still need to be furnished. The plan is for De Watergeus Swimming Pool to open before the summer. The editors of indebuurt were once again allowed to take a look inside the new swimming pool building. View the photos on the following pages.