“But the so-called cable tensioning works at the bottom of the bridge went very smoothly,” says Eveline Vandecaetsbeek of Roads and Traffic. “This allows the bridge to open much earlier, in both directions.”
“The nuisance on the E403 itself will remain the same until December 20,” says Roads and Traffic: two narrowed lanes towards Bruges and the taking of the left lane towards Kortrijk.”
