The province of Drenthe is tackling the connections between A and N roads. In 2025, the A37/N376 points near Veenoord and the A28/N855 near Spier and Dwingeloo will be overhauled.
There will be one roundabout at Veenoord, and two roundabouts at Spier. Total costs: 3.6 million euros.
The plans are part of the Provincial Executive’s road safety plan 2022-2026. Deputy Henk Jumelet (CDA) is satisfied with the planned work. “We are aiming for zero road casualties. Safe infrastructure, such as roundabouts, is an important part of this,” he says.
Once the Provincial Council has approved the plans, planning work will start.