“Millimeter work”: installation threshold in storm surge barrier is a feat
Many curious people came to see the works this morning. The concrete threshold weighs 4,500 tons, cranes have to lift it from a pontoon and lower it down.
This is by the way millimeter work: the construction has to be exactly in the right place on the seabed. Divers still assist with these works all day long.