“It is a pity that this project is again delayed,” react mayor Lieven Huys and ships Brecht Warnez. “However, we remain positive and are convinced that the new building and environmental construction can pass the water test favorably.”

On June 21, 2025, the permit was granted for the construction of the new cultural hall. The design includes a theater hall with a fixed grandstand, a polyvalent room with 200 seats and kitchen, meeting rooms, a spacious foyer and a cozy cultural café. The demolition of the existing room on Polenplein was planned for the beginning of September, but those works must now be postponed.

ttn-40