112 news: flooding of healthcare institution • car ends up in water along A2

The rainfall caused major damage to an NS control box. It is located at a railway crossing on the Euvelwegen in Heeze. The control box is completely submerged in water. The fire brigade ensured that the water was pumped out on Wednesday, but yesterday the damage appeared to be increasing. That reports Heede-Leende24.

The surrounding tiles have sunk into the ground and the water from the adjacent stream flows under the control box. As a result, the pipes become increasingly exposed. Because the water continues to flow, a repair is not yet possible. ProRail is monitoring the situation. The damage did not lead to disruptions or delays.

ttn-32