Although the bridge is still structurally in good condition, it is being adjusted to better connect inland shipping to European ports. The shifting slopes are also becoming less steep and the infrastructure on the connecting roads is becoming safer for cyclists.
The works last until the end of November. In the meantime, traffic has to be detour, but cyclists and pedestrians can continue to cross the Leie via the movable flower mill bridge.
