Liesbeth Desmedt, director GO primary school Centrum Bruges: “It will get better anyway. The old school was really an old building. We also had cold there. It also rained inside. Now everything is brand new. ”

The works to transform the old building on ‘t Zand into a modern primary school have lasted two and a half years longer than planned. Kayleigh van Passen, Bridge Figure Go Primary School Centrum Brugge: “I think a lot of parents had been waiting for a long time to go to the new school. It is a very hot school. Figuratively too. And I think it was time to become a warm school in appearance. “

ttn-40