The A32 between Meppel and Steenwijk closes this week at night. Due to work, the road is closed in the northern direction at night.

The road closes from Monday to Friday from 8 pm to 5 am, between the Havelte driveway and Steenwijk exit. Then maintenance work is carried out, and in some places the asphalt is replaced. The road also gets new road surfaces.

Various other entrances and exits have also been closed due to the work. Traffic is diverted locally or via the N50, A6 and A7. Travelers must take into account an extra travel time of 15 to 30 minutes.

ttn-41