In this television program, children repair the hole in the slide of our new swimming pool

In the new television program Builder Power children can be construction workers for a day. In the broadcast of Saturday December 16 you will see Shane at the construction site of our new swimming pool The Watergeus. Together with presenter Soy, they help the slide builder with repairing the hole in the fast slide.

In the new AVROTROS programme Builder Power children between the ages of four and seven, who have a great love for construction, will solve a construction problem together with presenter Soy Kroon. In previous episodes you see that the electricity at Schiphol is out and that there is a blockage in the sewer.

Read more under the photo>

Swimming pool The Watergeus Zoetermeer. Photo: in the Zoetermeer neighborhood

Hell of a slide

The Thrill Seeker slide is missing a middle section. The new slide is spectacular in itself, but without a middle section your slide will soon be very exciting. Fortunately, Shane and Soy, in collaboration with contractor Johan Schuurman from construction company Vaessen, have come up with a solution for this.

Here you watch Builder Power

The broadcast with the new swimming pool can be seen in episode 8 of season 1. It will be on Saturday, December 16 at 7.44 am on NPO3 / Z@ppelin.

Swimming pool De Watergeus Zoetermeer
Swimming pool shots The Watergeus Zoetermeer. Photo: Vaessen

More Zoetermeer news:

ttn-47