There was also debris on the street and this, like the debris on the aerial platform, must be cleared away. The building does not need to be propped up, because demolition is planned anyway.
When another part of the extensive warehouse was demolished, pressure apparently came on the walls, causing the facade to no longer hold up. Fortunately, no one was working at the aerial platform and no one was passing by at that location in Sint-Jansstraat.
