For the port of Ostend, there is still a choice between all-round embankment, a storm surge barrier for the harbor mouth or a lock complex. A lock or storm surge barrier must also be built for the Blankenberge marina.
They are already building a storm surge barrier in Nieuwpoort, but in the long term a higher storm surge barrier will have to be built at the same location.