The traffic in the Kennedytunnel has to go over one lane again on Sunday morning. After a whole day of traffic -ranging, it was decided to open a second lane yesterday afternoon after the contractor had called extra people. For a whole day it was about two hours on the ring in the direction of Ghent through the works. Since 12 o’clock a second lane has been open in the Kennedytunnel, although you are currently still switching for 45 minutes.
ttn-3

