Two bridges, which date from the opening of the domain in the late 1970s, have been completely renovated. The third bridge between the two islands made way for a new boardwalk. According to the province, this was technically the most difficult intervention, due to a bend and a height difference. An existing boardwalk on one of the islands was also renovated.
