PLAZA ESPANYA TUNNEL | The tunnel in the Plaza Espanya in Barcelona is closed to traffic throughout Holy Week

He tunnel of the plaza d’espanya of Barcelona has been cut off road traffic this Saturday and for the next 10 days. The damages occur between Mèxic and Llançà streets as a result of the impact of the plays connection of the lines of the Ferrocarrils de la Generalitat (FGC) from Vallès and Llobregat-Anoia.

The measure has been programmed on these dates to coincide with the less mobility that takes place in the Catalan capital during the festivities of Easterexplained the Territory department of the Generalitat in a statement.

visible retentions

However, that has not prevented withholdings from early in the morning of entering the city: access to the square by the surface through the great way has three lanes, of which two are intended for private vehicles, and the other to buses and taxis. These two lanes assume from today and until April 10 the traffic of the three lanes of the tunnel.

The Barcelona City Council directly recommends avoiding this main artery as a way of entry. In addition, to avoid further impacts on traffic, it has applied restrictions on Gran Via as of the Cerdà square. Specifically, it is only possible to cross the square through the side road.

Alternatives to avoid retentions

Related news

The Urban Guard of Barcelona recommends, as alternativeuse the rounds before reaching the Cerdà square. In the case of reaching this square, the police assure that it is best to turn towards the round of the mig or go find the promenade Free Zoneto access the coastal round.

In addition to the impact on the Plaza Espanya road tunnel, the Link works for the two FGC lines have led to the occupation of some vehicle traffic lanes in the future station of Hospital Clínic and the new station of Gràcia.



ttn-24